The Salwa Road Phase 2 Programme was completed in 2013 with a total cost of 1,700,000,000 QAR ππ
What did it include, exactly? π€
π7km of dual carriageway construction along the periphery of (then) existing road.
π8 lanes (4 in each direction), separated by a median, for the first time.
π4 upgraded interchanges and underpasses which assisted with traffic flow.
πA brand new storm water drainage system was installed including 2km of micro tunnels and a firefighting system for underpasses.
πPotable water networks, sewage lines and electric networks plus telecomms networks were also installed.
πRoadway lighting, Doha city surveillance systems, traffic signs and road markings were also part of this mega project.
How long did the project take and by whom?π€
3 years by Ashgal with Yuksel as contractor. π―π
Amazing infrastructure in record time! Thats how we Do it in Doha! πΆπ¦π